  Abstract:This article introduces the application of the multi-function energy meter in a farm in Mozambique and the solution of energy management system. The system adopts intelligent power meters to collect various electrical parameter and switching signals at the distribution site and the way of local networking, communicate via field bus and upload to background after networking.

  Keywords:Energy meter;Industrial projects;Intelligent power meter;Energy management system

  0.Project Overview

  The farm is located in Nampula, Mozambique, and mainly uses a three-phase electric energy meter APM800 and split core current transformers.It is used for electric energy and power measurement, and has event recording and data report export function.

  Acrel-3000 energy management system provides decentralized data acquisition and centralized monitoring and management of the substation and distribution system. It networks the secondary equipment of the power distribution system, connects the field equipment of scattered substation into an organic whole through computer and communication network, realizes remote monitoring and centralized management of grid operation.

  1.System Introduction

  This system adopts a hierarchical distributed structure,that is,the equipment layer, the communication layer and the station control management layer.

  The equipment layer is mainly multi-function energy meters. The corresponding primary equipment of these devices are respectively installed in the electrical cabinet. These devices all adopt RS485 communication interface,and realize data collection through field MODBUS network communication.

  The communication layer is mainly an industrial serial server.Its main function is to centrally collect the devices scattered in the field and transmit data to the station control management layer at the same time to complete the data interaction between the equipment layer and the station control management layer.

  The station control management layer is equipped with high-performance industrial computers, monitors, UPS power supplies, printers and other equipment.The system is installed on the computer, collects and displays the operating status of the field equipment, and displays it to the user in the form of human-computer interaction.

  2.Main Function

  2.1Data acquisition and processing

  Data collection is the basis of power distribution monitoring. The data collection is mainly completed by the bottom multi-functional network instrument collection to realize the local real-time display of remote data.

  The signals that need to be collected include: three-phase voltage U, three-phase current I, frequency Hz, power P, power factor COSφ, electricity EpI, remote device operating status and other data.

  Data processing is mainly to display the electrical parameters collected as required to users in real time and accurately to meet the requirements of automation and intelligence for power distribution monitoring. At the same time, the collected data is stored in the database for users to query.

  2.2Human-computer interaction

  The system provides a simple, easy-to-use and good user interface. Adopt full Chinese interface, graphically display the primary electrical wiring diagram of low-voltage power distribution system, display the status of power distribution system equipment and corresponding real-time operating parameters, the screen will switch regularly; the screen will be dynamically refreshed in real time; analog display; switch display; continuous recording display etc.

  2.3Historical events

  The historical event viewing interface mainly provides convenient and friendly human-computer interaction for users to view the fault records, signal records, operation records, and limit violation records that have occurred. Through the historical event viewing platform, you can conveniently locate the historical event you want to view according to your own requirements and query conditions, and provides good software support for you to grasp the operation of the entire system.

  2.4Database establishment and query

  It mainly completes the timing collection of remote measurement and remote information, and establishes a database, and generates reports on a regular basis for users to query and print.

  2.5User authority management

  For users of different levels, different authority groups are set to prevent the loss of production and life due to human misoperation, and realize the safe and reliable operation of the power distribution system.Users can log in, log out, modify passwords, add and delete operations through user management, which is convenient for users to modify accounts and permissions.

  2.6Report query

  The main function of the report management program is to design report styles according to the needs of users, filter, combine and count the data processed in the system to generate report data that users need.This program can also adopt the regular saving, printing or summon saving and printing modes for the report file according to the needs of users.At the same time, this program also provides users with the function of managing the generated report files.

  The report has the functions of freely setting the query time to realize the electric energy statistics of the day, month and year, data export and report printing.

  3.Product Introduction

  4.Project Summary

  It is paramount important that the safety of the projects in the application of power distribution facilities.This article introduces the application of Acrel-3000 energy management system can realize real-time monitoring of power supply and distribution circuits in power distribution rooms.It can not only display the power consumption status of the loop, but also has the function of network communication, and can form an electric energy management system with serial server, computer, etc.The system realizes the analysis and processing of the collected data, real-time display of the operation status of the distribution circuits in the distribution room, pop-up alarm dialog, voice prompt for load exceeding limits, and generates various electric energy reports, analysis curves, graphics, etc., which is convenient for remote meter reading, analysis and research of electric energy.The system is safe, reliable and stable in operation, providing a true and reliable basis for industrial projects to solve power problems, and has achieved good benefits.

亚洲日产av中文字幕一区| 国产激情av一区二区三区| 鸡巴插入女生的尿管网站| 男生和女生靠逼视频网站| 欧美大黑鸡巴操逼逼视频| 久久久久久久成人动漫片| 日本爱情电影高清完整版| 富婆被大黑屌操的嗷嗷叫| 色噜噜哟哟一区二区三区| 亚洲av无码一区二区三区| 女性的胸夹住男生的隐私| 裸体美女戳逼的视频网站| 欧美 一区 二区 亚洲| 超97在线视频免费观看| 末成年女A∨片一区二区| 鸡巴插进逼逼里视频软件| 亚洲av无码成人精品区在线观看 | 国产又粗又黄又爽的视频| 91成人爽a毛片免费观看| 老汉与妓婆操逼免费视频| 日韩免费电影一区二区三区| 美女被操出白浆免费网站| 亚洲日韩av无码精品放毛片| 91福利社区试看一分钟| 欧美肥妇白妇白乳大鸡巴| 顶级嫩模 一区二区三区| 国产精品美腿丝袜第一页| 男人桶女人18禁止网站| 亚洲第一区欧美国产综合| 女厕偷拍txxxxxxx视频| 一本av无码不卡免费版| 国产美妇口爆深喉视频区| 丁香婷婷激情综合俺也去| 国产农村熟妇videos| 美女美穴13p| 啊啊啊不要好爽在线观看| 熟妇乱子伦视频在线播放| 特黄的乱伦视频| 嗯啊插快点视频| 在线观看免费gv网钙片| 久久夜色精品国产噜噜亚洲av|